A NEW REVAMPING FOR CO-VER

12 Feb

A NEW REVAMPING FOR CO-VER


In December 2019 CO-VER Power Technology was engaged in another important revampingĀ on its own Cogeneration Plant in Sessa Aurunca (CE), at the Manucor plant. The revamping consisted of replacing the motors present with two new high efficiency motor generators useful for generating 7.2 MW, with an increase in electrical efficiency from 39% to 42%. The heat recovery unit for the gases from the engines was also replaced.