Electrical and civil engineering

COMPANY
World leader in the renewable energy field
Settore
Renewable energy
Data progetto
2013
Genzano di Lucania (PZ)
Background Image

What we have done

Electrical and civil engineering for the new MT/AT power substation for “La Rocca” wind farm.

  • COMPANY
    EDP Renewables is a world leader in the renewable energy field.
  • REQUIREMENT
    Study of the engineering designs needed to change the electrical substation in use at “La Rocca" wind farm from 30 kV to 150 kV for subsequent connection to the national grid.
  • SOLUTION
    Our team developed the basic and detailed engineering plans, providing the Client with the correct documentation to ensure the proper implementation of the electrical substation at the wind farm "La Rocca".

    The design included:
    - Drafting technical specifications for procurement of installation services and materials
    - Components sizing
    - Monitoring of electromagnetic fields, lightning strikes, risk of explosive atmospheres
    - Finding a trusted organization for the civil engineering contract